THE TECHNOLOGY
In the production the following components are used:
polymeric resin KFMT - 15 (for unipor); foaming ABSFK
(it is possible to use other kinds of foaming);
orthophosphoric acid, water.
At first, the solution is being prepared in the
following proportion: 10 litres of water, 40 ml of foaming
and 125 ml of orthophosphoric acid (the latter serves as
the catalyst). Then the capacity with the solution is
connected to the plant (on "foam") with the help of the
hose and the same way the capacity with resin is
connected (on "resin"). The compressor is also connected to
the plant. Then the chosen form is poured. It is possible
to use different forms for forming, but the ones able to
disassemble are preferable. After the foam being poured it
is necessary to wait 3 or 4 hours approximately. And then you
may start cutting penoizol. It is easily cut with the help
of fishing-line or string without being heated. After you have
cut the sheets, they must dry. The sheets should be dried
on the shelves approximately 1,5 - 3 days depending on the
temperature of the environment. The ventilation is required
in the premises as formaldehyde is educed when being produced
and dried.

